The Original Infiltrator ® Chamber System | Call (951) 654-9358 or Email us today |  | The Infiltrator Chamber System replaces old-fashioned stone and pipe leachfields with patented high-strength plymer chambers. Both the original Standard and High-Capacity infiltrator chambers are designed to fit in a typical 36" wide trench. Infiltrator chambers sit directly on the trench bottom. The patented interlocks add strength and latch the infiltrator chambers together quickly, end to end, so installation of the infiltrator takes less than half the time of a laborious stone and pipe job. Infiltrator chambers may be used for any application that is suitable for stone and pipe. However, by offering greater infiltrative capacity per linear foot, infiltrator chamber systems may require as little as half the space as conventional systems. $XXXX per chamber Discounts available for large quantity orders! Call today (951) 654-9358 | Patented MicroLeaching™ Sidewall The infiltrator chamber has an engineered, louvered sidewall that allows effluent to pass laterally into the soil. The angled louvers prevent backfill intrusion into the infiltrator chamber system while 1/4" slots allow lateral leaching.
|  | One of the Top 10 Distributors, Hemet Valley Pipe carries the full line of Infiltrator products.
| Open Chamber bottom boosts infiltration. The infiltrator chamber bottom is completely open, promoting effluent infiltration into the soil with 100% efficiency. The open-bottom area, in combination wiht the MicroLeaching sidewall, provides maximum infiltrative capacity for long-term, trouble-free service.
| High-density polyethylene construction. Infiltrator chambers are molded of high-density PolyTuff™ polyethylene. The proprietary blend is formulated for optimum strength and chemical resistance. Infiltrator chambers are manufactured using an exclusive patented process to assure consistent high quality. |  |  | - Labor-intensive, lengthy installation
- Dump truck needed for stone delivery
- Stone hauling adds expense and time, and increases soil compaction.
- Stone in trench reduces Long-Term Acceptance Rate by more than 50%
- Heavy traffic across yar and spilled stone mean ther is more site repair needed after installation.
- System lacks easy inspection and monitoring of leachfield without digging up yard.
- Geotextile required on top of stone.
- Greater overall cost
| - Easy assembly and installation by two people
- Only a backhoe and pickup are required
- Lightweight infiltrator chambers can be delivered in one pickup truck load and hand-carried into position.
- Entire trench bottom is open for effluent infiltration with 100% efficiency.
- There is less regrading, tree damage and landscape repair involved, and no stone cleanup.
- Inspection port is available for easy access to leachfield with no site distrubtion.
- Lower overall cost.
|  |  |
|